Infrastructure

UBT has been part of numerous European Union Projects, aiming to raise its infrastructure. As a result of this collaboration UBT has succeeded in earning projects respectively in; Efficient Energy, Mechatronics Laboratory, GIS Laboratory, Design Studio, Computer Science Lab, TV Studio etc. Along with a wide range of modern infrastructure and facilities, UBT meets the demands in compliance with the most innovative trends required by the international trends.

UBT facilities are spread to different locations as: Campus in Pristine, Innovation Campus in Lipjan including benches with total of 37132m2 dedicated to Amphitheaters, Laboratories, Classrooms, Studios, Library, Dental clinic, Clinical room, Advisory Center, Translation Room, Reading hall and offices. In addition, part of the new facility of 27000m2 will be used as a dormitory, based on the requests made and the needs presented over the years for students who come from regions that need long-term housing.

Also, branch in Prizren for the year 2021/22 will be expended with the innovation park with area of 13042m2, which mean the total UBT infrastructure will be increased to 50174m2